Reconstruction of St. David Street North (Hwy#6) Fergus
Numéro de sollicitation BT-RFT#12-24
Date et heure de clôture 2024/03/26 18:00 HAE
Date de la dernière modification
Description
The scope of work on the above listed streets in the former Town of Fergus, now with the Township of Centre Wellington includes: Soil Excavation, Rock Excavation, Granular Base, Hot Mix Asphalt, Storm Sewer, Watermain, Sanitary Sewer, Traffic Signals, Pedestrian Cross Over, Concrete Curb and Gutter, Concrete Sidewalk, Underground Hydro/Utilities and Street Lighting.
Phase 1 (2024 Construction) work comprises of the reconstruction of St. David Street North (Highway No. 6) from St. Andrew Street to 50m north of Garafraxa Street.
Phase 2 (2025 Construction) work comprises of the reconstruction of St. David Street North (Highway No. 6) from 50m north of Garafraxa Street to Edinburgh Avenue.
2026 Construction work comprises of structure/water valve adjustments, surface asphalt paving and line painting from St. Andrew Street to Edinburgh Avenue.
Durée du contrat
La durée estimée du contrat sera de 10 mois.
Accords commerciaux
-
Accord de libre-échange canadien (ALEC)
Coordonnées
Organisation contractante
- Organisation
-
Township Of Centre Wellington
- Adresse
-
1 MacDonald SquareElora, Ontario, N0B1S0Canada
- Autorité contractante
- Sandi Wiles
- Numéro de téléphone
- 111-111-1111
- Adresse courriel
- swiles@centrewellington.ca
Détails de l'offre
Les détails complets de cette occasion de marché sont disponibles sur un site tiers
Cliquez sur le bouton ci-dessous pour vous rendre vers ce site Web. Le site tiers pourrait exiger la création d’un compte personnel pour consulter l’occasion de marché ou pour soumissionner. Les informations reliées aux frais encourus pour accéder aux détails complets sont indiqués sous l’onglet Description.