ITT23BCWSHQ021 Penticton Fire Zone– New drying room & Exercise area Building
Numéro de sollicitation 9080
Date de publication
Date et heure de clôture 2022/11/24 17:00 HNE
Date de la dernière modification
Description
Overview of the Work/Service Required
BC Wildfire Service currently has facilities in Penticton for the Kamloops fire centre.
Currently, the Penticton Fire Zone is without the facilities ensuring fire line staff have adequate drying space for fireline clothing and related gear on base. The current set up provides not enough drying space for the need of an expanding base, with no space for alternatives in existing buildings. In addition, there is a need for expanded fitness training space, and space for required off season fitness equipment storage per CPPM 8.3.2.
The purpose of this tender is to construct a building that allows the installation of an adequate drying room facility, providing the Penticton FZ appropriate space for drying fireline clothing and gear/equipment, and to provide both fitness training space and seasonal storage for fitness equipment to protect government assets from the elements.
Scope
The ministry requires the services of a general contractor to undertake the construction, delivery and installation of a new drying room and exercise area building at the fire zone. This ITT calls for the new construction of a 93 sq m (1000 sq ft) single-story wood framed building structure that shall include foundations, concrete aprons, canopies and gutter, all exterior and interior finishes including insulation, electrical & mechanical equipment and accessories.
The contractor shall provide full construction, delivery and installation of the new building in accordance with the objectives set above and the drawings and specifications attached.
The contractor must also provide the following:
The contractor shall be responsible for managing the subcontractors, consultants, and vendors, and involving them throughout the project, start to finish, from design through construction.
The attached drawings and specifications describe in detail the extend of the works.
Electrical services:
New electrical service connection, cables and conduits shall be part of this scope of work. Conduits shall be installed to accommodate for final connection and installation. This contract shall call for the connection and installation of a new service panel in the new building as well as security system with door position, exterior/interior lighting system, power to mechanical equipment, supply and installation of mechanical equipment, power and data infrastructure and lighting and power cabling.
BC Wildfire Service currently has facilities in Penticton for the Kamloops fire centre.
Currently, the Penticton Fire Zone is without the facilities ensuring fire line staff have adequate drying space for fireline clothing and related gear on base. The current set up provides not enough drying space for the need of an expanding base, with no space for alternatives in existing buildings. In addition, there is a need for expanded fitness training space, and space for required off season fitness equipment storage per CPPM 8.3.2.
The purpose of this tender is to construct a building that allows the installation of an adequate drying room facility, providing the Penticton FZ appropriate space for drying fireline clothing and gear/equipment, and to provide both fitness training space and seasonal storage for fitness equipment to protect government assets from the elements.
Scope
The ministry requires the services of a general contractor to undertake the construction, delivery and installation of a new drying room and exercise area building at the fire zone. This ITT calls for the new construction of a 93 sq m (1000 sq ft) single-story wood framed building structure that shall include foundations, concrete aprons, canopies and gutter, all exterior and interior finishes including insulation, electrical & mechanical equipment and accessories.
The contractor shall provide full construction, delivery and installation of the new building in accordance with the objectives set above and the drawings and specifications attached.
The contractor must also provide the following:
- Issue of certified structural drawings based on the IFC set
- Site preparation:
- Potential land clearing
- Grading
- Compaction
- Engineering survey
- Full construction, delivery, and installation of the new facility
The contractor shall be responsible for managing the subcontractors, consultants, and vendors, and involving them throughout the project, start to finish, from design through construction.
The attached drawings and specifications describe in detail the extend of the works.
Electrical services:
New electrical service connection, cables and conduits shall be part of this scope of work. Conduits shall be installed to accommodate for final connection and installation. This contract shall call for the connection and installation of a new service panel in the new building as well as security system with door position, exterior/interior lighting system, power to mechanical equipment, supply and installation of mechanical equipment, power and data infrastructure and lighting and power cabling.
Durée du contrat
Voir la description ci-dessus pour voir tous les détails.
Accords commerciaux
-
Veuillez consulter la description ou les documents de l'appel d'offres
Coordonnées
Organisation contractante
- Organisation
-
Penticton Fire Zone
- Autorité contractante
- Gilles Clement-Reynier
- Adresse courriel
- Gilles.ClementReynier@gov.bc.ca
Détails de l'offre
Les détails complets de cette occasion de marché sont disponibles sur un site tiers
Cliquez sur le bouton ci-dessous pour vous rendre vers ce site Web. Le site tiers pourrait exiger la création d’un compte personnel pour consulter l’occasion de marché ou pour soumissionner. Les informations reliées aux frais encourus pour accéder aux détails complets sont indiqués sous l’onglet Description.