RFP for Prime Contractor Services for SFU Terry Fox Field and Field4
Numéro de sollicitation BC228436
Date de publication
Date et heure de clôture 2026/05/25 17:00 HAE
Description
This Opportunity Notice is for informational purpose only. In order to access the RFP Package, you are instructed to go to www.merx.com; to submit your response, use MERX Reference#0000318313 or Solicitation Number P308696CM.
==========================
SFU is seeking proposals from commercially established companies with substantial experience and proven capacity for the provision of Artificial Turf Replacement Services at the Burnaby Campus.
The desired completion date for Terry Fox field will be July 10th, 2026, and the desired completion date for Athletic Field 4 will be August 14th, 2026.
Established in 1965, with vibrant campuses in Vancouver, Burnaby and Surrey, SFU has become Canada's leading comprehensive university. With more than 30,000 students, 6,500 faculty and staff, and 130,000 alumni, SFU has matured into one of the world’s leading teaching and research universities, consistently ranked among Canada’s top comprehensive universities.
Terry Fox Field and Field #4 at the Burnaby Campus are used by a plethora of user groups including Athletics & Recreation for varsity games and practices, SFU Recreation programming, student clubs and both internal and external community events. The fields, roughly 180,000 square feet combined is the largest open outdoor space for activities on campus.
The replacement of the two synthetic turf fields due to their age and near failure of safety/condition assessments is being proposed. The current fields have reached the end of their lifecycle, and their deteriorating condition poses safety risks to users. By replacing these fields, we will ensure the provision of a safe and high-quality playing surface, benefiting athletics, sports organizations, and the community at large. The two synthetic turf fields in question were installed over a decade ago (Terry Fox Field = 2011; Field#4 = 2004) and their condition has significantly deteriorated over time. Continuous use, exposure to harsh weather conditions, and reoccurring snow removal have led to issues such as excessive wear, uneven surface, infill displacement, and reduced shock absorption. The project deliverables include the provision of all labour, material, equipment, transportation and other services related to the removal and replacement of artificial turf at Terry Fox Field and Field 4.
See full project details in the RFP package.
==========================
SFU is seeking proposals from commercially established companies with substantial experience and proven capacity for the provision of Artificial Turf Replacement Services at the Burnaby Campus.
The desired completion date for Terry Fox field will be July 10th, 2026, and the desired completion date for Athletic Field 4 will be August 14th, 2026.
Established in 1965, with vibrant campuses in Vancouver, Burnaby and Surrey, SFU has become Canada's leading comprehensive university. With more than 30,000 students, 6,500 faculty and staff, and 130,000 alumni, SFU has matured into one of the world’s leading teaching and research universities, consistently ranked among Canada’s top comprehensive universities.
Terry Fox Field and Field #4 at the Burnaby Campus are used by a plethora of user groups including Athletics & Recreation for varsity games and practices, SFU Recreation programming, student clubs and both internal and external community events. The fields, roughly 180,000 square feet combined is the largest open outdoor space for activities on campus.
The replacement of the two synthetic turf fields due to their age and near failure of safety/condition assessments is being proposed. The current fields have reached the end of their lifecycle, and their deteriorating condition poses safety risks to users. By replacing these fields, we will ensure the provision of a safe and high-quality playing surface, benefiting athletics, sports organizations, and the community at large. The two synthetic turf fields in question were installed over a decade ago (Terry Fox Field = 2011; Field#4 = 2004) and their condition has significantly deteriorated over time. Continuous use, exposure to harsh weather conditions, and reoccurring snow removal have led to issues such as excessive wear, uneven surface, infill displacement, and reduced shock absorption. The project deliverables include the provision of all labour, material, equipment, transportation and other services related to the removal and replacement of artificial turf at Terry Fox Field and Field 4.
See full project details in the RFP package.
Durée du contrat
Voir la description ci-dessus pour voir tous les détails.
Accords commerciaux
-
Veuillez consulter la description ou les documents de l'appel d'offres
Coordonnées
Organisation contractante
- Organisation
-
Simon Fraser University
- Autorité contractante
- Wells Song
- Adresse courriel
- wells_song@sfu.ca
Détails de l'offre
Les détails complets de cette occasion de marché sont disponibles sur un site tiers
Cliquez sur le bouton ci-dessous pour vous rendre vers ce site Web. Le site tiers pourrait exiger la création d’un compte personnel pour consulter l’occasion de marché ou pour soumissionner. Les informations reliées aux frais encourus pour accéder aux détails complets sont indiqués sous l’onglet Description.