EN25DMK006 - Omenica River Bridge Debris Removal
Numéro de sollicitation BC196857
Date de publication
Date et heure de clôture 2024/05/22 14:30 HAE
Description
This contract requires the removal of debris accumulated against the bridge pilings on the bridge over the Omineca River, in the Mackenzie Forest District. The works include regular inspection of the bridge during freshet(s) and high flow events, as well as monthly observations/inspections and clearing as required. The bridge is accessible by gravel road approximately 184 km north of Mackenzie.
Durée du contrat
La durée estimée du contrat sera de 4 mois.
Accords commerciaux
-
Veuillez consulter la description ou les documents de l'appel d'offres
Coordonnées
Organisation contractante
- Organisation
-
District of Mackenzie
- Autorité contractante
- Kirk Smith
- Adresse courriel
- Kirk.Smith@gov.bc.ca
Détails de l'offre
Les détails complets de cette occasion de marché sont disponibles sur un site tiers
Cliquez sur le bouton ci-dessous pour vous rendre vers ce site Web. Le site tiers pourrait exiger la création d’un compte personnel pour consulter l’occasion de marché ou pour soumissionner. Les informations reliées aux frais encourus pour accéder aux détails complets sont indiqués sous l’onglet Description.