City of Fort St. John 100 Street Corridor Redevelopment - 2024 Phas 5
Numéro de sollicitation BC187455
Date de publication
Date et heure de clôture 2024/01/31 17:00 HNE
Description
The City of Fort St. John is currently accepting tender submissions for City of Fort St. John – 100 STREET CORRIDOR REDEVELOPMENT – 2024 PHASE 5
The work to be undertaken generally consists of, but not limited to the following:
The work to be undertaken generally consists of, but not limited to the following:
- Construction of approximately 250 linear metres of roadway including landscaped boulevards, streetlighting, and decorative lighting.
- Replacement of water, sanitary and storm utilities
- Construction of signalized intersection and two pedestrian activated crossings.
Tenders are schedule to close on January 31, 2024 at 2:00 PM local time through the tendering website at https://urbansystems.bidsandtenders.ca/. Please refer to tender advertisement below for tender details.
Durée du contrat
Voir la description ci-dessus pour voir tous les détails.
Accords commerciaux
-
Veuillez consulter la description ou les documents de l'appel d'offres
Coordonnées
Organisation contractante
- Organisation
-
City of Fort St John
- Autorité contractante
- Lin Lin
- Adresse courriel
- llin@fortstjohn.ca
Détails de l'offre
Les détails complets de cette occasion de marché sont disponibles sur un site tiers
Cliquez sur le bouton ci-dessous pour vous rendre vers ce site Web. Le site tiers pourrait exiger la création d’un compte personnel pour consulter l’occasion de marché ou pour soumissionner. Les informations reliées aux frais encourus pour accéder aux détails complets sont indiqués sous l’onglet Description.