MOYIE LAKE PROVINICAL PARK OPERATIONAL HAND TREATMENT TU1
Numéro de sollicitation 178657
Date de publication
Date et heure de clôture 2023/09/22 19:00 HAE
Description
BC Parks is initiating a wildfire risk reduction/ ecosystem maintenance treatment within Moyie Lake Provincial Park. The project will include services as per the approved fuel management prescription on the BC Parks Wildfire Prevention Prescription template that reviews BC Parks Legislation. The services include but are not limited to, reducing the stems/ha and the continuity of forest fuels both vertically (i.e., ladder fuel potential), and horizontally (i.e., potential to sustain a crown fire), surface fuel clean-up, and pile and burning or removal off-site of residual material that is consistent with BC Park values and the Wildfire Risk Reduction objectives for mitigating wildfire spread in the wildland-urban interface. This phase of treatment will include a total of 6.0 ha. The successful Contractor will have until March 31st, 2024, to complete the pile burning or removal of fuel clean up off-site.
Durée du contrat
La durée estimée du contrat sera de 6 mois.
Accords commerciaux
-
Veuillez consulter la description ou les documents de l'appel d'offres
Coordonnées
Organisation contractante
- Organisation
-
BC Parks and Conservation Officer Service Division
- Adresse
-
3208 Brana RdMoyie, British Columbia, V0B 2A0Canada
- Autorité contractante
- Katherine McGlynn
- Adresse courriel
- Katherine.McGlynn@gov.bc.ca
- Adresse
-
3208 Brana RdMoyie, British Columbia, V0B 2A0Canada
Détails de l'offre
Les détails complets de cette occasion de marché sont disponibles sur un site tiers
Cliquez sur le bouton ci-dessous pour vous rendre vers ce site Web. Le site tiers pourrait exiger la création d’un compte personnel pour consulter l’occasion de marché ou pour soumissionner. Les informations reliées aux frais encourus pour accéder aux détails complets sont indiqués sous l’onglet Description.