Rail Trail Bridge Replacement, Chute Creek - RC24230-009
Numéro de sollicitation 171666
Date de publication
Date et heure de clôture 2023/07/06 17:00 HAE
Date de la dernière modification
Description
This project consists of the removal and replacement of a 4.5m timber trestle (KV-031) on the Kettle Valley Rail Trail, south of Chute Lake, with a 10.12m steel girder superstructure with concrete deck on lock block abutments and concrete construction pad. An existing timber trestle bridge (KV-032) will need to be temporarily over spanned with a 15.2m All-Steel portable (ASP) structure for the duration of the project to facilitate industrial traffic to the work site.
Durée du contrat
La durée estimée du contrat sera de 12 mois.
Accords commerciaux
-
Accord de libre-échange canadien (ALEC)
-
Veuillez consulter la description ou les documents de l'appel d'offres
Coordonnées
Organisation contractante
- Organisation
-
Recreation Sites and Trails Branch
- Adresse courriel
- alex.soukup@gov.bc.ca
Détails de l'offre
Les détails complets de cette occasion de marché sont disponibles sur un site tiers
Cliquez sur le bouton ci-dessous pour vous rendre vers ce site Web. Le site tiers pourrait exiger la création d’un compte personnel pour consulter l’occasion de marché ou pour soumissionner. Les informations reliées aux frais encourus pour accéder aux détails complets sont indiqués sous l’onglet Description.