RH24DSE001 - Heavy Equipment Wildfire Rehabilitation Work – Fry Creek
Numéro de sollicitation BC159492
Date de publication
Date et heure de clôture 2023/03/27 17:00 HAE
Date de la dernière modification
Description
This contract is for the rehabilitation works of wildfire suppression activities on the Fry Creek Wildfire. Rehabilitation works generally involve but are not limited to: ditching, slope stabilization, and the reduction of a fire hazard created by suppression activities. The project area is in the Kootenay Lake Fire Zone. The contractor shall supply equipment (i.e., mini excavator) and qualified operators to complete the assigned work. All rehabilitation works will be completed to the standards provided (Appendix 1 Water Management Techniques) and to the approval of the Ministry Representative.
Specific specifications for equipment can be found in the Tender Documents (Schedule A).
Specific specifications for equipment can be found in the Tender Documents (Schedule A).
Durée du contrat
La durée estimée du contrat sera de 12 mois.
Accords commerciaux
-
Veuillez consulter la description ou les documents de l'appel d'offres
Coordonnées
Organisation contractante
- Organisation
-
Ministry of Forests
- Autorité contractante
- Noah Foster
- Adresse courriel
- Noah.Foster@gov.bc.ca
Détails de l'offre
Les détails complets de cette occasion de marché sont disponibles sur un site tiers
Cliquez sur le bouton ci-dessous pour vous rendre vers ce site Web. Le site tiers pourrait exiger la création d’un compte personnel pour consulter l’occasion de marché ou pour soumissionner. Les informations reliées aux frais encourus pour accéder aux détails complets sont indiqués sous l’onglet Description.