Aurum Road Washout Recovery
Numéro de sollicitation 14137MJ0000
Date de publication
Date et heure de clôture 2023/09/28 17:00 HAE
Date de la dernière modification
Description
The Aurum Road washout was triggered by the November 2021 rainfall event during which significant debris (predominantly sands and gravels) traveled downslope, forming a wide erosion channel and depositing as an alluvial fan across Highway 5 and Carolin Mine Road. (predominantly sands and gravels) traveled downslope, forming a wide erosion channel and depositing as an alluvial fan across Highway 5 and Carolin Mine Road. and Carolin Mine Road.This tender is related to grading works, supply and installation of new concrete barriers, full depth gravel road Reconstruction and Realignment reconstruction and realignment, culvert removal and replacement, channel works and gravel spillway installation, and site restoration.
Please direct all project specific enquiries related to this RFx by email to the Project Contact identified on the “Opportunity Details” tab under Additional Information SCT3.
Please direct all project specific enquiries related to this RFx by email to the Project Contact identified on the “Opportunity Details” tab under Additional Information SCT3.
Durée du contrat
La durée estimée du contrat sera de 2 mois.
Accords commerciaux
-
Accord de libre-échange canadien (ALEC)
-
Veuillez consulter la description ou les documents de l'appel d'offres
Coordonnées
Organisation contractante
- Organisation
-
South Coast Regional Office
- Adresse courriel
- Provincialcontracts@gov.bc.ca
Détails de l'offre
Les détails complets de cette occasion de marché sont disponibles sur un site tiers
Cliquez sur le bouton ci-dessous pour vous rendre vers ce site Web. Le site tiers pourrait exiger la création d’un compte personnel pour consulter l’occasion de marché ou pour soumissionner. Les informations reliées aux frais encourus pour accéder aux détails complets sont indiqués sous l’onglet Description.