Infrastructure - Pre-qualification Request - Switchgear Replacement Project Request for Qualifications
Numéro de sollicitation AB-2024-08709
Date de publication
Date et heure de clôture 2024/10/16 10:00 HAE
Date de la dernière modification
Description
Altus Group on behalf of Alberta Infrastructure
The Jubilee Center Condominium Corporation is requesting proposals from qualified Engineering firms to provide all design and engineering services for the Switchgear Replacement project. The intent is to engage an Engineer as Prime Consultant to provide services for the project, including the provision of all necessary design disciplines. The work will require, but is not limited to, Electrical, Structural, and Architectural design.
Addendum No.: 01 - October 3, 2024
Durée du contrat
La durée estimée du contrat sera de 12 mois, avec une date de début proposée du 2024/11/29.
Accords commerciaux
-
Accord de libre-échange canadien (ALEC)
Coordonnées
Organisation contractante
- Organisation
-
Infrastructure
- Adresse
-
Suite 2100, 6950-113 StreetEdmonton, CA-AB, T6H 5V7CA
- Autorité contractante
- Adam Brahim
- Adresse courriel
- adam.brahim@altusgroup.com
- Adresse
-
10250 101 St NWEdmonton, Alberta, T5J 3P4Canada
Détails de l'offre
Les détails complets de cette occasion de marché sont disponibles sur un site tiers
Cliquez sur le bouton ci-dessous pour vous rendre vers ce site Web. Le site tiers pourrait exiger la création d’un compte personnel pour consulter l’occasion de marché ou pour soumissionner. Les informations reliées aux frais encourus pour accéder aux détails complets sont indiqués sous l’onglet Description.