The Heart Creek flood mitigation structure is substantially complete, however there are additional scopes of work and deficiency repairs required to complete the project. The remaining work includes:
*Installation of grouted stone pitching to tie into bedrock at upstream end of project.
*Installation of a maintenance access road from the west off Highway 1.
*Installation of erosion protection in Lac Des Arcs.
*Removal of sediment from existing low flow channel.
*Completion of deficiency work including installation of class 3 rip-rap, installation of grout into incomplete grouted stone pitching, cutting existing weep hole PVC, drilling weep holes to ensure they drain site restoration.
*Other minor scopes as required.
Durée du contrat
La durée estimée du contrat sera de 3 mois, avec une date de début proposée du 2024/07/17.
Accords commerciaux
-
Accord de libre-échange canadien (ALEC)
Coordonnées
Organisation contractante
- Organisation
-
Municipal District of Bighorn No. 8
- Adresse
-
P.O. Box 310 2 Heart Mountain DriveExshaw, CA-AB, T0L 2C0CA
- Autorité contractante
- Doug Fulford
- Adresse courriel
- doug.fulford@mdbighorn.ca
- Adresse
-
2 Heart Mountain DriveExshaw, Alberta, T0L 2C0Canada
Détails de l'offre
Les détails complets de cette occasion de marché sont disponibles sur un site tiers
Cliquez sur le bouton ci-dessous pour vous rendre vers ce site Web. Le site tiers pourrait exiger la création d’un compte personnel pour consulter l’occasion de marché ou pour soumissionner. Les informations reliées aux frais encourus pour accéder aux détails complets sont indiqués sous l’onglet Description.