    D4. SCOPE OF SERVICES
    D4.1 The Services required under this Contract shall consist of Professional Consulting Service in accordance with D5 to D9 and the following phases:
    (a) Phase 1 – Condition Assessment as outlined in D7
    (b) Phase 2 – Options Analysis as outlined in D8
    (c) Phase 3 – Preliminary Design as outlined in D9
    D4.1.1 The Services required under D4.1 shall be in accordance with the City’s Project Management Manual http://winnipeg.ca/infrastructure/asset-management-program/templates-manuals.stm#2 and templates http://winnipeg.ca/infrastructure/asset-management-program/templates-manuals.stm#4 . Notwithstanding the foregoing, the Consultant is being engaged by the City for their professional expertise; the Consultant shall bring to the Project Manager’s attention any aspect of the City’s Project Management Manual or templates which the Consultant is of the opinion is not consistent with good industry practice.
    D4.2 The following shall apply to the Services:
    (a) Universal Design Policy
    http://clkapps.winnipeg.ca/DMIS/DocExt/ViewDoc.asp?DocumentTypeId=2&DocId=3604
    (b) City of Winnipeg Writing Style Guide and Brand Standards;
    (c) Appropriate geometric standards set by the Transportation Association of Canada (TAC);
    (d) City of Winnipeg’s Transportation Standards Manual (Draft 2012);
    (e) Transportation Master Plan 2011; https://winnipeg.ca/publicworks/transportation/pdf/transportationMasterPlan/2011-11-01-TTRWinnipegTMP-Final-Report.pdf
    (f) Transportation Master Plan 2050 (ongoing), refer to winnipeg.ca/tmp2050.
    (g) Winnipeg Transit Master Plan (2021), as adopted by Council on April 29, 2021. https://winnipegtransit.com/en/major-projects/transit-master-plan
    (h) City of Winnipeg’s Accessibility Design Standards (latest edition); http://winnipeg.ca/ppd/Universal_Design.stm
    (i) City of Winnipeg’s Tree Planting Details and Specifications Downtown Area and Regional Streets (May 2009);
    (j) City of Winnipeg’s Tree Removal Guidelines (latest edition);
    (k) The current edition of The City of Winnipeg Standard Construction Specifications.
    (l) Winnipeg Pedestrian and Cycling Strategies, http://walkbike.winnipeg.ca
    (m) Current and best practices in pedestrian and cycling infrastructure design.
    (n) Canadian Highway Bridge Design Code, CSA S6 (latest edition).
    (o) Ontario Structures Inspection Manual (OSIM), latest edition.
    (p) City of Winnipeg’s Project Management Manual and associated templates and processes.
     
    Adresse de l’entreprise
    1-59 Scurfield Boulevard
    Winnipeg, Manitoba, R3Y 1V2
    Canada
    Méthode d'approvisionnement
    Concurrentielle – Invitation ouverte à soumissionner
    Langue(s)
    Anglais

    Durée du contrat

    La durée du contrat sera de 7 mois, entre le 2023/10/02 et le 2024/05/24.

    Accords commerciaux

    • Accord de libre-échange canadien (ALEC)
    • Accord économique et commercial global (AECG) entre le Canada et l’Union européenne (UE)
    • Veuillez consulter la description ou les documents de l'appel d'offres
    Coordonnées

    Organisation contractante

    Organisation
    The City of Winnipeg
    Adresse
    185 King Street
    Winnipeg, Manitoba, R3B 1J1
    Canada
    Autorité contractante
    Suzanne Bird
    Numéro de téléphone
    204-986-7507
    Adresse courriel
    sbird@winnipeg.ca
    Date de modification: