Replacement of the Ketza River Mine Access Road Bridges #1 and 2
Numéro de sollicitation BT-RFB-2023-1-2275
Date de publication
Date et heure de clôture 2023/04/26 19:00 HAE
Description
Community where work will occur: Town of Ross River
Traditional Territory where work will occur: The Kaska Nation
Description: The bridge locations are Bridge #1: 61.700556 N, 132.156667 W and Bridge #2: 61.684444 N, 132.173333 W. This project includes replacement of the existing steel girder bridge and degraded timber foundation with new timber decking, concrete foundations, and retaining walls, and re-using the existing steel girders for the new bridge structure. Work also includes installation of temporary access bridges to maintain vehicular access throughout construction, regrading of approaches, flow diversion, and rip rap installation. All in-stream work will be completed during fish timing window (July 1 – August 30, 2023).
Durée du contrat
La durée estimée du contrat sera de 6 mois.
Accords commerciaux
-
Accord de libre-échange canadien (ALEC)
Coordonnées
Organisation contractante
- Organisation
-
Yukon
- Adresse
-
Box 2703Whitehorse, YT, Y1A 2C6Canada
- Autorité contractante
- Geena Grossinger
- Adresse courriel
- geena.grossinger@yukon.ca
Détails de l'offre
Les détails complets de cette occasion de marché sont disponibles sur un site tiers
Cliquez sur le bouton ci-dessous pour vous rendre vers ce site Web. Le site tiers pourrait exiger la création d’un compte personnel pour consulter l’occasion de marché ou pour soumissionner. Les informations reliées aux frais encourus pour accéder aux détails complets sont indiqués sous l’onglet Description.