RFP for Construction Manager

Numéro de sollicitation BC10441

Date de publication

Date et heure de clôture 2023/01/23 19:00 HNE

Date de la dernière modification


    Description
    The CSF is issuing this RFP to look for a construction manager for pre-construction and construction management for a new Mass Timber Gymnasium, as well as a one-storey wood frame addition to the existing school, that includes Change Rooms, Washrooms, Office and Storage. The new Gymnasium will be separated from the existing school by a full-height concrete block firewall. In addition, there are renovations required to the existing Gymnasium, Stage and Kitchen spaces, which will provide more Multi-Purposes spaces for the school's use.

    The project is located at 7674 Stave Lake Street in Mission. It is anticipated that the project will start in March 2023. 

    Durée du contrat

    Voir la description ci-dessus pour voir tous les détails.

    Accords commerciaux

    • Veuillez consulter la description ou les documents de l'appel d'offres
    Coordonnées

    Organisation contractante

    Organisation
    School District 93 Francophone Education Authority
    Adresse
    7674 Stave Lake St
    Mission, British Columbia, V2V 4G4
    Canada
    Adresse courriel
    nicholas@driftpm.ca
    Adresse
    7674 Stave Lake St
    Mission, British Columbia, V2V 4G4
    Canada
    Détails de l'offre

    Les détails complets de cette occasion de marché sont disponibles sur un site tiers

    Cliquez sur le bouton ci-dessous pour vous rendre vers ce site Web. Le site tiers pourrait exiger la création d’un compte personnel pour consulter l’occasion de marché ou pour soumissionner. Les informations reliées aux frais encourus pour accéder aux détails complets sont indiqués sous l’onglet Description.

    Détails

    Type d’avis
    Autre
    Langue(s)
    Anglais