Guiderail Replacement Various Locations Km 1783.0 to km 1868.5 Alaska Highway #1, km 77.8 to km 79.5 Klondike Highway #2 and km 123.8 to km 123.9 Haines Road #3
Numéro de sollicitation BT-RFB-2024-7-3761
Date de publication
Date et heure de clôture 2024/08/08 19:00 HAE
Description
Community: Carcross, Destruction Bay and Beaver Creek, YT and Pleasant Camp, BC
Traditional Territory: Champagne and Aishihik, Carcross/Tagish, Kluane First Nation, and White River First Nation
The Project consists of guiderail and end terminal replacement on various sections of the Alaska Highway #1 from km 1783.0 to km 1868.5 and on the Klondike Highway #2, from km 77.8 to km 79.5 and on the Haines Road #3, from km 123.8 to km 123.9 including posts and spacers installation. The work consists of but is not limited to: Mobilization and Demobilization; Traffic Control; Supply, delivery, and removal of existing guiderail and reinstallation of new W-beam Guiderail, posts and spacers, and end terminals; and Environmental Compliance.
Durée du contrat
La durée estimée du contrat sera de 4 mois.
Accords commerciaux
-
Accord de libre-échange canadien (ALEC)
Coordonnées
Organisation contractante
- Organisation
-
Yukon
- Adresse
-
Box 2703Whitehorse, YT, Y1A 2C6Canada
- Autorité contractante
- Bibiana Zavadova
- Adresse courriel
- Bibiana.Zavadova@yukon.ca
Détails de l'offre
Les détails complets de cette occasion de marché sont disponibles sur un site tiers
Cliquez sur le bouton ci-dessous pour vous rendre vers ce site Web. Le site tiers pourrait exiger la création d’un compte personnel pour consulter l’occasion de marché ou pour soumissionner. Les informations reliées aux frais encourus pour accéder aux détails complets sont indiqués sous l’onglet Description.