Sunrise Lake Feasibility Study & Detailed Design
Numéro de sollicitation BCRFP 23-113
Date de publication
Date et heure de clôture 2023/08/01 17:00 HAE
Description
The Corporation of the Township of Langley (the “Township”) wishes to engage qualified professionals to undertake a feasibility study, including a detailed assessment of Sunrise Lake hydrology and existing drainage infrastructure to design and construct an outlet storm sewer for flood mitigation purposes. The first phase involves confirming feasibility of the proposed outlet and identifying flow conveyance requirements to avoid flood risk transfer and meet current Township standards, Subsequently, selected engineering design(s) are to be advanced to tender-ready detailed design level.
It is anticipated that a team of qualified professionals would include at a minimum water resources engineering, civil/municipal engineering, hydrogeology, and environmental specialists.
It is anticipated that a team of qualified professionals would include at a minimum water resources engineering, civil/municipal engineering, hydrogeology, and environmental specialists.
Durée du contrat
Voir la description ci-dessus pour voir tous les détails.
Accords commerciaux
-
Veuillez consulter la description ou les documents de l'appel d'offres
Coordonnées
Organisation contractante
- Organisation
-
Township of Langley
- Adresse courriel
- bidsinfo@tol.ca
Détails de l'offre
Les détails complets de cette occasion de marché sont disponibles sur un site tiers
Cliquez sur le bouton ci-dessous pour vous rendre vers ce site Web. Le site tiers pourrait exiger la création d’un compte personnel pour consulter l’occasion de marché ou pour soumissionner. Les informations reliées aux frais encourus pour accéder aux détails complets sont indiqués sous l’onglet Description.