Clearwater 2024 Roadworks
Numéro de sollicitation BC345-991
Date de publication
Date et heure de clôture 2024/05/23 17:00 HAE
Description
The District of Clearwater invites tenders for the construction of 2 separate projects.
Project 1 – Old North Thompson Highway Shoulder/ Pathway Widening (345-991-001):
Road Widening works in the Dutch Lake Beach area of Clearwater. A summary of specific work items includes the following (approx. quantities):
Project 2 – Candle Creek Pavement Rehabilitation (345-991-002):
The construction of pavement rehabilitation works in the Candle Creek Road area of Clearwater. A summary of specific work items includes the following (approx. quantities):
Electronic Contract Documents can be downloaded from the BC Bid website bcbid.gov.bc.ca.
Paper copies may be ordered and picked up at the address below, on payment of a non-refundable amount of fifty ($50) dollars, including GST (cheques payable to TRUE Consulting):
TRUE Consulting
2089 Falcon Road
Kamloops, BC V2C 4J2
Tenders are scheduled to close:
Tender Closing Time: 2:00 pm local time
Tender Closing Date: Thursday May 23rd, 2024 at:
District of Clearwater
209 Dutch Lake Road
Clearwater, BC V0E 1N0
For additional information, please contact:
Chris Crowell, P.Eng.
TRUE Consulting
Email: ccrowell@true.bc.ca
Phone: 250-819-3991
Project 1 – Old North Thompson Highway Shoulder/ Pathway Widening (345-991-001):
Road Widening works in the Dutch Lake Beach area of Clearwater. A summary of specific work items includes the following (approx. quantities):
- Approximately 173m³ of common excavation;
- Approximately 839m² of supply and place 150mm – 19mm Granular Base;
- Approximately 750m² of supply and place 50mm hot mix asphalt – UC#1;
- Apply permanent painted pavement markings;
- Approximately 390m² Boulevard restoration;
Project 2 – Candle Creek Pavement Rehabilitation (345-991-002):
The construction of pavement rehabilitation works in the Candle Creek Road area of Clearwater. A summary of specific work items includes the following (approx. quantities):
- Approximately 5,780m2 of reshaping granular base;
- Approximately 1,390m2 of granular base for shouldering;
- Approximately 5,040m2 of supply and place hot mix asphalt– UC#1;
Electronic Contract Documents can be downloaded from the BC Bid website bcbid.gov.bc.ca.
Paper copies may be ordered and picked up at the address below, on payment of a non-refundable amount of fifty ($50) dollars, including GST (cheques payable to TRUE Consulting):
TRUE Consulting
2089 Falcon Road
Kamloops, BC V2C 4J2
Tenders are scheduled to close:
Tender Closing Time: 2:00 pm local time
Tender Closing Date: Thursday May 23rd, 2024 at:
District of Clearwater
209 Dutch Lake Road
Clearwater, BC V0E 1N0
For additional information, please contact:
Chris Crowell, P.Eng.
TRUE Consulting
Email: ccrowell@true.bc.ca
Phone: 250-819-3991
Durée du contrat
Voir la description ci-dessus pour voir tous les détails.
Accords commerciaux
-
Veuillez consulter la description ou les documents de l'appel d'offres
Coordonnées
Organisation contractante
- Organisation
-
District of Clearwater
- Adresse
-
209 Dutch Lake RdClearwater, British Columbia, V0E 1N2Canada
- Adresse courriel
- ccrowell@true.bc.ca
- Adresse
-
209 Dutch Lake RdClearwater, British Columbia, V0E 1N2Canada
Détails de l'offre
Les détails complets de cette occasion de marché sont disponibles sur un site tiers
Cliquez sur le bouton ci-dessous pour vous rendre vers ce site Web. Le site tiers pourrait exiger la création d’un compte personnel pour consulter l’occasion de marché ou pour soumissionner. Les informations reliées aux frais encourus pour accéder aux détails complets sont indiqués sous l’onglet Description.