NRGH Rehab Chiller Upgrade - Consulting Services
Numéro de sollicitation BC2281108-RFP Consulting Services
Date de publication
Date et heure de clôture 2023/03/02 17:00 HNE
Description
This Request for Proposal (RFP) is for:
1. Architectural firms as Prime/Managing Consultant,
2. Electrical Engineering,
3. Mechanical Engineering,
4. Structural Engineering,
This RFP is for individual consultant firms; it is not for consultant teams. Island Health will engage each of the consultants separately. The Rehabilitation (Rehab) Building at the Nanaimo Regional General Hospital (NRGH) is currently supplied chilled water by a single 200 ton chiller, as well as some additional chilled water from the hospital’s central plant. Over the life of this chiller, the peak cooling loads of the Rehab building have increased, which necessitates adding additional cooling capacity to this building. Also, the existing chiller is over 25 years old and is end of life. This project will replace the existing 200 ton chiller with a new high efficiency chiller of high cooling capacity. This RFP will procure consultants to assist with the design, procurement and construction contract administration of this replacement. This project will be procured through two separate procurements, with the first procurement covering for the chiller and other long lead time equipment, and the second covering the installation on site. An optimization study of the NRGH chiller plant and chilled water system was completed in January 2018 and has been included here for your reference. Refer to the attachment “vii. NRGH Chiller Plant & Chilled Water System Optimization Study”.
See attachments for more details
Addenda posted in discussion forum
1. Architectural firms as Prime/Managing Consultant,
2. Electrical Engineering,
3. Mechanical Engineering,
4. Structural Engineering,
This RFP is for individual consultant firms; it is not for consultant teams. Island Health will engage each of the consultants separately. The Rehabilitation (Rehab) Building at the Nanaimo Regional General Hospital (NRGH) is currently supplied chilled water by a single 200 ton chiller, as well as some additional chilled water from the hospital’s central plant. Over the life of this chiller, the peak cooling loads of the Rehab building have increased, which necessitates adding additional cooling capacity to this building. Also, the existing chiller is over 25 years old and is end of life. This project will replace the existing 200 ton chiller with a new high efficiency chiller of high cooling capacity. This RFP will procure consultants to assist with the design, procurement and construction contract administration of this replacement. This project will be procured through two separate procurements, with the first procurement covering for the chiller and other long lead time equipment, and the second covering the installation on site. An optimization study of the NRGH chiller plant and chilled water system was completed in January 2018 and has been included here for your reference. Refer to the attachment “vii. NRGH Chiller Plant & Chilled Water System Optimization Study”.
See attachments for more details
Addenda posted in discussion forum
Durée du contrat
Voir la description ci-dessus pour voir tous les détails.
Accords commerciaux
-
Veuillez consulter la description ou les documents de l'appel d'offres
Coordonnées
Organisation contractante
- Organisation
-
Vancouver Island Health Authority
- Autorité contractante
- Christopher Chmara
- Adresse courriel
- Christopher.Chmara@islandhealth.ca
Détails de l'offre
Les détails complets de cette occasion de marché sont disponibles sur un site tiers
Cliquez sur le bouton ci-dessous pour vous rendre vers ce site Web. Le site tiers pourrait exiger la création d’un compte personnel pour consulter l’occasion de marché ou pour soumissionner. Les informations reliées aux frais encourus pour accéder aux détails complets sont indiqués sous l’onglet Description.