Wedge Creek Bridge Design-Build Replacement Project
Numéro de sollicitation BC191987
Date de publication
Date et heure de clôture 2024/04/22 16:22 HAE
Description
The RMOW is inviting qualified teams to provide design-build proposals for a new clear span cable suspension bridge to replace an existing timber recreation bridge located over Wedge Ck. This bridge is a key part of the Comfortably Numb Trail in Whistler BC. The existing 22m log stringer bridge, has reached its end of life and requires removal and replacement with a new long lasting and low maintenance, cable suspension bridge. Proponents are encouraged to align their designs with the areas recreational use and natural site characteristics while ensuring the efficiency of construction is well understood and managed within the constraints of the topography and access.
Durée du contrat
Voir la description ci-dessus pour voir tous les détails.
Accords commerciaux
-
Veuillez consulter la description ou les documents de l'appel d'offres
Coordonnées
Organisation contractante
- Organisation
-
Resort Municipality of Whistler
- Adresse courriel
- ksibbald@whistler.ca
Détails de l'offre
Les détails complets de cette occasion de marché sont disponibles sur un site tiers
Cliquez sur le bouton ci-dessous pour vous rendre vers ce site Web. Le site tiers pourrait exiger la création d’un compte personnel pour consulter l’occasion de marché ou pour soumissionner. Les informations reliées aux frais encourus pour accéder aux détails complets sont indiqués sous l’onglet Description.