Wastewater Treatment Plant Masterplan
Numéro de sollicitation EC-03-022-01
Date de publication
Date et heure de clôture 2022/11/03 16:00 HAE
Date de la dernière modification
Description
Aquatera is seeking a qualified consulting firm to provide engineering consulting services for a comprehensive review of the entire wastewater treatment process at Aquatera’s Wastewater Treatment Plant (WWTP) located in Grande Prairie, AB. The scope is from the raw wastewater influent coming into the plant to the effluent being discharged into the Wapiti River. The consultant will assess upcoming regulatory changes, the current and future capacity requirements of the plant, equipment lifespans, potential technological improvements, and cost savings opportunities. The Masterplan will give recommendations on capital projects and operational changes to meet the future needs of the plant for the next 25 years.
Durée du contrat
La durée estimée du contrat sera de 5 mois, avec une date de début proposée du 2022/12/08.
Accords commerciaux
-
Accord de libre-échange canadien (ALEC)
-
Accord économique et commercial global (AECG) entre le Canada et l’Union européenne (UE)
Coordonnées
Organisation contractante
- Organisation
-
Aquatera Utilities Inc
- Adresse
-
11101-104 AveGrande Prairie, Alberta, T8V 8H6Canada
- Autorité contractante
- Sandy Hadwen
- Numéro de téléphone
- 780 538 0457
- Adresse courriel
- shadwen@aquatera.ca
- Adresse
-
11101-104 AveGrande Prairie, Alberta, T8V 8H6Canada
Détails de l'offre
Les détails complets de cette occasion de marché sont disponibles sur un site tiers
Cliquez sur le bouton ci-dessous pour vous rendre vers ce site Web. Le site tiers pourrait exiger la création d’un compte personnel pour consulter l’occasion de marché ou pour soumissionner. Les informations reliées aux frais encourus pour accéder aux détails complets sont indiqués sous l’onglet Description.