KINUSO FLOOD STUDY
Numéro de sollicitation 24TDRRSD894
Date de publication
Date et heure de clôture 2024/02/14 16:00 HNE
Date de la dernière modification
Description
The purpose of the Kinuso Flood Study is to assess and identify flood hazards along approximately 21 km of the Swan River through the community of Kinuso, Big Lakes County, and Swan River First Nation. The study will be completed under the provincial Flood Hazard Identification Program (FHIP), the goals of which include enhancement of public safety and reduction of future flood damages through the identification of flood hazards.
Hydraulic modelling and flood mapping is required for approximately 21 km of the Swan River. The study area for the Swan River extends from the south edge of NE 1-73-10-W5M downstream to approximately the middle of SE 31-73-9-W5M.
Durée du contrat
La durée estimée du contrat sera de 13 mois, avec une date de début proposée du 2024/02/26.
Accords commerciaux
-
Accord de libre-échange canadien (ALEC)
-
Accord économique et commercial global (AECG) entre le Canada et l’Union européenne (UE)
Coordonnées
Organisation contractante
- Organisation
-
Environment and Protected Areas
- Adresse
-
6th Floor, South Petroleum Plaza 9915-108 StreetEdmonton, Alberta, T5K 2G8Canada
- Autorité contractante
- Muhammad Durrani
- Numéro de téléphone
- 780-427-0228
- Adresse courriel
- muhammad.durrani@gov.ab.ca
- Adresse
-
River Engineering and Technical Services 11th Floor, Oxbridge Place, 9820- 106 Street NWEdmonton, Alberta, T5K 2J6Canada
Détails de l'offre
Les détails complets de cette occasion de marché sont disponibles sur un site tiers
Cliquez sur le bouton ci-dessous pour vous rendre vers ce site Web. Le site tiers pourrait exiger la création d’un compte personnel pour consulter l’occasion de marché ou pour soumissionner. Les informations reliées aux frais encourus pour accéder aux détails complets sont indiqués sous l’onglet Description.