Forestry and Parks - Request for Proposal - EDSON WILDFIRE RECLAMATION of EWF031 EAST
Numéro de sollicitation AB-2024-09221
Date de publication
Date et heure de clôture 2024/11/28 09:00 HNE
Date de la dernière modification
Description
Alberta Forestry and Parks, in its mandate to prevent and suppress wildfires within the Province is required to reclaim disturbed forest land caused by wildfire suppression operations. These sites were essential for effective wildfire operations and include fireguards, creek crossings, pipeline crossings, and helipads. Wildfire reclamation is required to prevent or reduce the potential of soil erosion and ensure soil stabilization on or near the fire line. Reclamation of disturbances also promotes the recovery of the disturbed land base for wildlife habitat (i.e. caribou) and vegetative growth. Due to soil conditions, the reclamation work must be done when the ground conditions are in a frozen state.
Wildfire EWF031-2023 is 201,913 ha in size. EWF031 EAST is located southeast of the town of Edson, near N53 21.5686 W115 45.3529
Also included in the EWF031 EAST contract will be 3 wildfires (EWF036, EWF056, and EWF093) from the 2021 wildfire season. One wildfire, EWF036-2021, was completely overrun in 2023 and the required reclamation of dozer guard/watercourse crossings is included in the data for EWF031. Wildfires EWF056-2021 and EWF093-2021 are located together east of the main wildfire near N53 23.6239 W115 22.2253
EWF031 EAST - During suppression efforts, there were approximately 128 km of fireguard constructed that requires reclamation. This construction involved heavy equipment pushing ground vegetation (shrubs, grasses, and trees) aside to expose mineral soil and restrict/slow wildfire progression. To assist ground crews; 22 stream crossings, 40 pipeline crossings, 2 helipads and 1 bell hole were built and will require reclamation as well.
EWF056-2021 and EWF093-2021 are two interconnected wildfires. They have a combined length of approximately 6 km of fireguard that requires reclamation. There are also 4 stream crossings that were built at the time that may still require removal.
Reclamation with mechanical equipment is required to recover the land base to a near natural state. The fireguard travels through mainly spruce and pine stands, taking advantage of natural clearings when possible. Reclaiming the fireguard will require pulling back the topsoil, woody debris, and any displaced trees onto the grubbed fire guard. The trees are to be broken up mechanically or manually slashed so to be made to lie flat to the ground. Leaning or damaged trees that cannot be reached mechanically without causing significant additional damage to the forest, will be manually felled and/or bucked to lie flat to the ground.
There are specific erosion mitigation measures that need to be implemented directly on guard approaches at a number of watercourse crossing locations. Installation of cross ditches and silt fencing will also be required to aid in water run-off management and in trapping sediment before it gets into the watercourse.
Durée du contrat
La durée estimée du contrat sera de 3 mois, avec une date de début proposée du 2024/12/06.
Accords commerciaux
-
Accord sur les marchés publics de l'Organisation mondiale du commerce (AMP-OMC)
Coordonnées
Organisation contractante
- Organisation
-
Forestry and Parks
- Adresse
-
J.G. O'Donoghue Building 7000-113 StreetEdmonton, CA-AB, T6H 5T6CA
- Autorité contractante
- Pat Scobie
- Adresse courriel
- pat.scobie@gov.ab.ca
- Adresse
-
111 54 St, #203Edson, CA-AB, T7E 1T2CA
Détails de l'offre
Les détails complets de cette occasion de marché sont disponibles sur un site tiers
Cliquez sur le bouton ci-dessous pour vous rendre vers ce site Web. Le site tiers pourrait exiger la création d’un compte personnel pour consulter l’occasion de marché ou pour soumissionner. Les informations reliées aux frais encourus pour accéder aux détails complets sont indiqués sous l’onglet Description.